Bathroom remodeling in Burlington, NC

Bathrooms are the rooms we are called about most. Whether the shower is worn out or the whole room needs to be rebuilt, we start by listening and looking.

Bright remodeled bathroom with a glass walk-in shower, white vanity and large mirror
Call (336) 654-1130Serving Burlington and nearby Alamance County townsEstimates scheduled by phone

Where most bathroom projects begin

Very few people call us because they want a new bathroom in the abstract. They call because the grout is cracked, the tub is hard to step over, the vanity has swollen from years of humidity, or the floor feels soft near the toilet. A bathroom takes more abuse per square foot than any other room in the house, and it shows. Steam, splashing, soap and daily temperature swings all push on every surface.

That is why bathroom remodeling is rarely only about looks. A good project fixes the cause of what is wearing out, then rebuilds the room so the same thing does not happen again in a few years. At Alonso Remodeling Service LLC we plan every bathroom around three questions: what is failing, what do you want to be able to do in this room, and how much of it needs to change to get there.

The kinds of bathroom work we take on

Tiled shower with a glass door, niche and handheld shower

Some bathrooms need a full gut. Many only need one part done well. We sort jobs into rough categories so the estimate matches the real scope.

  • Refresh: new fixtures, vanity, mirror, paint and flooring in an otherwise sound room.
  • Shower and tub work: shower restoration, tub-to-shower conversions and walk-in showers.
  • Accessibility: wider doorways, curbless entries, grab bar blocking and seating, covered in our accessible bathroom work.
  • Primary bathroom rebuilds: double vanities, larger showers and relocating fixtures where the framing allows.
  • Full renovation: everything out, subfloor and framing checked, new waterproofing, tile, plumbing fixtures and lighting.

What a full bathroom remodel involves

Even a small bathroom has a lot happening in a short space. This is the general order we follow on a full remodel.

  1. Protect the path through the house, cover the floors and set up a clean work zone.
  2. Remove old fixtures, tile, vanity and flooring, then inspect the subfloor and wall framing for rot, mold or old leaks.
  3. Repair what we find. Soft subfloor and stained studs should be dealt with before anything new goes in.
  4. Rough in any plumbing or electrical changes, with the appropriate trade performing and inspecting that part.
  5. Install cement board or a waterproof system in wet areas, and flood-test the shower pan where it applies.
  6. Set tile, let it cure, grout and seal it according to the product instructions.
  7. Install the vanity, toilet, shower fixtures, lighting, accessories and trim.
  8. Walk through the room with you, test every fixture and clean up.

Waterproofing is the part you will never see

A new bathroom lives or dies by what is behind the tile. Grout and tile are not waterproof by themselves. They shed most of the water, and a membrane or board system behind them handles the rest. If that layer is skipped or installed carelessly, moisture creeps into the wall and subfloor, and the damage shows up months or years later as stained ceilings below, loose tile or a musty smell.

When we quote a shower or tub surround, we tell you which waterproofing method we plan to use and why. If your current shower is leaking, we will point out the signs and explain whether a repair is realistic or whether a rebuild makes more sense. Our page on shower restoration goes deeper into this.

Choosing materials that fit the room

Bathrooms reward practical choices. Large-format porcelain tile has fewer grout lines to maintain. Textured or small-format floor tile gives better grip when it is wet. Solid-surface or quartz vanity tops resist stains and do not need sealing. Moisture-resistant paint and a properly sized exhaust fan keep mold from taking hold on the ceiling.

We bring samples, talk through maintenance and show you the trade-offs. You make the final decision, and we make sure the materials you pick are compatible with each other and with the way you use the room.

Planning around your household

If this is your only bathroom, we can talk about how to schedule the work so you are not without a shower for longer than necessary. If someone in your home has limited mobility, we plan door widths, floor transitions and the height of fixtures at the start, not as an afterthought. Pets, children and work-from-home schedules all matter too. Tell us about them when you call.

What affects the price

We do not publish a number because the range is wide. The size of the room, tile and fixture choices, whether plumbing moves, the condition of the subfloor and the amount of waterproofing involved all change the cost. We write the estimate after we see the room, and it spells out which items are included. For ideas about how to think through a budget before you call, see how we plan kitchen and bathroom projects together.

Questions we hear on the phone

Short answers to what callers ask most. Call if yours is not here.

How long does a bathroom remodel take?

A small refresh can take a few days. A full remodel with new tile, waterproofing and fixtures takes longer because materials need time to cure. We give you a window at the estimate visit and tell you early if something changes.

Can I stay in my house during the work?

Usually yes. If it is your only bathroom, we can discuss the schedule so your downtime is as short as practical.

Do you move plumbing?

Sometimes. Relocating a toilet or shower drain depends on the framing and the home's layout. We tell you what is practical during the visit.

Do I need a permit?

Cosmetic updates often do not. Changes to plumbing, electrical or structure commonly do. We will let you know what applies to your project, and you can confirm with your local inspections office.

Tell us about your project.

Call and we will schedule your estimate.

Call (336) 654-1130
Call (336) 654-1130