Kitchen cabinet installation in Burlington, NC

Cabinets are the largest part of a kitchen and the part that lives with you every day. A careful installation makes even a modest cabinet look good.

Bright kitchen with white cabinets, an island with stools and stainless appliances
Call (336) 654-1130Serving Burlington and nearby Alamance County townsEstimates scheduled by phone

Choosing cabinets

Cabinets come in three broad groups. Stock cabinets are built in standard sizes and are available quickly. Semi-custom cabinets offer many sizes and finishes and are made to order. Custom cabinets are built to your exact dimensions and are the most expensive and most flexible. Each can look excellent. The right choice depends on your kitchen shape, your timeline and your budget.

Construction quality matters as much as style. Plywood boxes handle moisture better than particleboard. Dovetail drawers and soft-close hinges last longer. Solid wood doors can be refinished. We help you compare what you are getting for each price.

Options for updating cabinets

  • Full replacement: new boxes, doors and drawers, with a new layout if desired.
  • Refacing: keep existing boxes and replace the doors and drawer fronts and veneer the frames.
  • Painting or refinishing: a lower-cost update when the boxes and doors are in good shape.
  • Hardware and accessories: new pulls, soft-close hinges and pull-out organizers.
  • Partial updates: replacing a few cabinets, adding an island or upgrading the pantry.

How installation goes

  1. Confirm the layout, measure the walls and verify the cabinet order against the plan.
  2. Remove old cabinets, counters and anything that blocks the work.
  3. Repair walls, find studs and mark level lines for upper and lower cabinets.
  4. Install upper cabinets first, then lowers, shimming to keep them level and plumb.
  5. Join cabinets together and fasten them to the wall.
  6. Install doors, drawers, hardware, crown molding and filler pieces.
  7. Template countertops once cabinets are set, see kitchen countertop installation.

Why level matters

Floors in older houses slope, and walls bow. A cabinet set by the floor will tilt. The first lower cabinet is set to a level reference line, and every other cabinet follows it with shims under the base. That keeps the counters flat, doors aligned and drawers from rolling open. It also means the finished floor, if it is not already in, must be planned around the base cabinets.

Details that make cabinets look custom

Crown molding, light rail under the uppers, toe-kick details and matching end panels give stock cabinets a built-in look. Filler strips close gaps at walls and corners. Glass doors and open shelves break up long runs. We discuss these accents at the planning stage. For a complete kitchen plan, see kitchen remodeling.

Timelines

Cabinet orders can take several weeks. We schedule demolition around the delivery date so your kitchen is not out of service longer than necessary. Once cabinets arrive, installation usually takes a few days for an average kitchen.

Mistakes that cost you later

Ordering cabinets without field measurements is the biggest. Plans drawn from a quick sketch often miss a half inch here or there, and that is enough to leave a gap or a clash. Another is placing the dishwasher or refrigerator without checking clearances. A third is installing cabinets before the floor is laid in a way that forces you to cut the new floor around them. We plan the order of work to avoid all of these.

Hardware and function

Pulls and knobs are the jewelry of cabinets. Choose a size that feels good in your hand, and mount them consistently. Soft-close hinges and drawer slides cost little and are used constantly. Pull-out trays in base cabinets turn deep, dark corners into useful storage. A trash pull-out and a tray divider for baking sheets are small items that earn their keep.

Delivery and storage

Cabinets should be delivered to a dry area of the house and left in their boxes until installation. Inspect each box when it arrives and report damage to the supplier right away. We check the order against the plan before we start.

Questions we hear on the phone

Short answers to what callers ask most. Call if yours is not here.

Can I keep my old cabinets?

If they are sound and the layout works, refacing or refinishing can be a good value.

What are soft-close hinges?

Hinges that slow the door as it shuts. They are standard on many lines and can be added to others.

Do you install cabinets I bought elsewhere?

Yes. We inspect them on delivery and flag damage early.

How long does installation take?

Usually a few days for an average kitchen, after cabinets arrive.

Tell us about your project.

Call and we will schedule your estimate.

Call (336) 654-1130
Call (336) 654-1130