Home additions in Burlington, NC

When a house no longer fits the people living in it, an addition lets you stay in the neighborhood you like without trading up to a different address.

Call (336) 654-1130Serving Burlington and nearby Alamance County townsEstimates scheduled by phone

Staying put and growing

There are plenty of reasons people add to a home rather than move. Maybe you love the street, the schools or the neighbors. Maybe interest rates make a new mortgage unattractive. Maybe you have spent years on the yard and do not want to start over. Whatever the reason, an addition is a way to change what your house can do while keeping what you like about where it sits.

Home additions are the broadest category we handle. They cover everything from a ten-by-twelve bump-out to a full second level. This page gives you an overview. More focused pages cover room additions, sunroom additions, second story additions and in-law suite additions.

Types of additions

  • Ground-level wing: a new section built out from the side or rear, often with a bedroom, bath or family room.
  • Bump-out: a small extension that enlarges a kitchen, a bedroom or a bathroom by a few feet.
  • Second story: a new level over some or all of the existing footprint.
  • Over-garage: living space built above an attached garage.
  • Sunroom or porch enclosure: a bright, partly conditioned room off the back.
  • Accessory suite: a self-contained space for a relative, guest or caregiver.

Questions we ask first

Before any drawing, we ask what the new space is for. A master suite needs different things from a playroom. We ask how it should connect to the rest of the house, since a door in the wrong place can make a new room feel disconnected. We ask about your yard, because an addition uses some of it. And we ask about your budget, because a realistic number shapes a realistic plan.

We also look at the lot. Setback rules, easements, septic systems, trees and the slope of the land all influence where an addition can go. In some neighborhoods, homeowner association rules add further limits.

The stages of an addition

  1. Design and drawings: layout, elevations and structural details, drawn to what your local inspections office needs.
  2. Permits and approvals: building permit, and any zoning or HOA approvals that apply.
  3. Site work and foundation: excavation, footings and foundation walls or slab.
  4. Framing and roof: floor, walls and roof structure, tied into the existing house.
  5. Weatherproofing: windows, doors, house wrap, siding and roofing.
  6. Rough-in: plumbing, electrical and HVAC, with inspections.
  7. Insulation and drywall, then flooring, trim, paint and fixtures.
  8. Final inspections and walkthrough.

Tying the new into the old

The detail that separates a good addition from a bad one is the connection point. The roof tie-in must shed water properly. The foundation must handle settling in a way that does not crack walls. The floor heights must match. The siding and trim should flow naturally from one to the next. And inside, the opening between old and new should look like it was part of the design.

We pay special attention to those points, because that is where water, air and cracks find their way in.

Heating, cooling and the load on your systems

More space means more demand on the heating and cooling system. Sometimes the existing equipment has room to spare, sometimes it does not. We look at the age and size of your system and tell you whether to extend it, replace it or add a separate unit for the addition.

Cost and schedule realities

Additions cost more per square foot than most other remodeling because they include foundation, structure and exterior envelope as well as finishes. They also take longer, and weather can cause delays. We give you a staged estimate and calendar so you know what to expect, and we tell you early if a change in scope would alter the budget.

Questions we hear on the phone

Short answers to what callers ask most. Call if yours is not here.

How long does an addition take?

Small additions can take a few months, larger ones longer. The schedule depends on permits, weather and material lead times.

Can I live in my house during construction?

Yes, in most cases. We seal the work area from the rest of the house and keep entries tidy.

Do I need an architect?

Not always. For many additions, a drawing prepared to local standards is enough. Complex designs may call for an architect or engineer.

Will an addition match my existing house?

That is a priority. We match rooflines, siding, windows and trim as closely as the materials allow.

Tell us about your project.

Call and we will schedule your estimate.