Second story additions in Burlington, NC

If your lot is small or your yard is precious, building up can give you the space you need without losing a square foot of land.

Call (336) 654-1130Serving Burlington and nearby Alamance County townsEstimates scheduled by phone

Why build up

A second story addition makes sense when the lot is limited by setbacks, trees, a septic field or simply a yard you want to keep. It also tends to cost less per square foot than a ground-level addition for the foundation portion, since the footprint already exists. And for a one-story ranch, adding a second level can change the look of the house entirely.

It is also a big project. The roof comes off. The existing walls and foundation must be checked for the added weight. Stairs must be added, and they take real space. And the house may be partly uninhabitable for a time, depending on how the work is staged.

What must be checked first

  • Foundation and footings: can they carry another floor?
  • Existing walls: are they strong enough, or must they be reinforced?
  • Ceiling joists: usually they are not strong enough to become floor joists.
  • Stair location: where will stairs go, and what will they take from the floor below?
  • Mechanical systems: where will ducts, pipes and wiring run?
  • Roof design: a new roof must match or complement the old.

How the work is staged

  1. Design and engineering to confirm that the structure can carry the added load.
  2. Permits and approvals.
  3. Remove the existing roof, usually in a few days, with the house sealed against weather.
  4. Build the new floor system and framing.
  5. Install the new roof and make the shell weathertight.
  6. Add stairs, plumbing, electrical and heating and cooling.
  7. Finish drywall, flooring, trim and paint on both levels.

Living through it

Many families move out for part of the project, especially during roof removal and framing. Some stay on the ground floor with temporary protection. We talk through your options at the estimate. We also explain the risk of weather during the open-roof stage and how we protect the house.

Exterior and interior finishes

The new level should look like it was always there. We match or blend siding, windows and roofing and think about the proportions of the house from the street. Inside, the stair and the upper hall are the most important design elements. See home additions and bedroom additions.

Stairs and the floor below

Every second story needs a way to get there, and a staircase is bigger than most people expect. A typical run needs a rectangular area of roughly three feet by twelve, plus landing space at both ends. On the first floor that space comes out of a room, a closet or a hallway. We usually choose the stair location before designing the rest, because the stairs decide how the floor below must change.

Plumbing is another consideration. Upstairs bathrooms are easiest to plumb when they stack above existing bathrooms or the kitchen. We look at where your waste lines are and suggest placements that keep pipe runs reasonable.

Weather and protection

The roof is open for a short time during framing. We schedule that work for a stretch of dry days, keep tarps on site and close up each evening. Even so, rain can happen, and we explain how we respond. Your belongings on the top floor should be moved out before work begins.

Taxes, insurance and records

After a second story addition, your insurance coverage and property tax assessment may change. Tell your insurer before the work starts, and keep copies of permits and final inspections. Those documents matter when you refinance or sell.

Questions to ask first

  • Can the foundation carry a second level, and who confirms that?
  • Where will the stairs go and what will they replace below?
  • How long will the roof be open and how will it be protected?
  • Where will our family stay during the loudest stages?

Questions we hear on the phone

Short answers to what callers ask most. Call if yours is not here.

Can any house have a second story?

Not every house. The foundation and walls must be able to carry it. An engineer confirms.

Will I need to move out?

Many families do for part of the project. We discuss options.

How long does it take?

Several months in most cases.

Does it need engineering?

Yes. Structural work like this requires it.