Kitchen remodel timeline: what happens and in what order

A kitchen remodel is a sequence of steps, and many of them depend on each other. Knowing the order helps you plan meals, decisions and patience.

Bright kitchen with white cabinets, an island with stools and stainless appliances
Call (336) 654-1130Serving Burlington and nearby Alamance County townsEstimates scheduled by phone

Why timelines vary

There is no single number of weeks that fits every kitchen. A simple update that keeps the layout is a different project from a full gut with new plumbing and walls. Custom cabinets and special-order countertops add lead time. Inspections and weather also play a part. What stays the same is the order of the work.

This guide walks through the phases in the sequence they usually happen. For costs, see our guide to kitchen remodel cost.

Phase one: planning and design

This phase happens before any tools come out, and it is the one people most often rush. You decide on a layout, cabinet style, counters, appliances, flooring, lighting and finishes. We measure, discuss options and write a scope. If walls, plumbing or gas lines will move, permits are applied for now.

Take your time here. Changes made on paper are free, while changes made after cabinets are ordered are expensive.

Phase two: ordering and lead times

Cabinets, countertops, appliances and special tile are ordered. Some items arrive in days, others take weeks. Countertops often cannot be measured until cabinets are installed, which affects the schedule. Appliances should be on site, or at least have confirmed dimensions, before cabinets are finalized.

A good plan lines up deliveries so that work does not stop waiting for a missing part. We recommend confirming everything has arrived before demolition begins.

Phase three: demolition and rough-in

  1. Protect floors and seal off the work area.
  2. Remove old cabinets, counters, flooring and any walls that are changing.
  3. Make structural changes if needed.
  4. Run new plumbing, electrical and venting.
  5. Add insulation and repair walls.
  6. Schedule rough-in inspections where required.

Phase four: surfaces and cabinets

After rough-in passes, drywall goes up and is finished, then painted or primed. Flooring is installed, either before or after cabinets depending on the plan. Cabinets are set, leveled and secured. Then the countertop is measured and fabricated, which can take several days to weeks depending on the material.

This is the phase where the room starts to look like a kitchen again. See kitchen cabinet installation and kitchen countertop installation for details.

Phase five: finishing

  • Countertops are installed and sinks and faucets connected.
  • Backsplash tile is set and grouted.
  • Appliances are installed and tested.
  • Lighting fixtures, switches and outlet covers are finished.
  • Trim, paint touch-ups and hardware are completed.
  • Final inspection and a walk-through with you.

Living through it

Plan to cook differently. Set up a temporary kitchen with a microwave, a hot plate or slow cooker, and a place to wash dishes, such as a bathroom or laundry sink. Stock easy meals. Expect dust, noise and workers in the house during the day. We protect floors and keep the work area tidy, but a remodel is still a disruption.

Keep decisions ahead of the schedule. The most common cause of delay is a homeowner waiting to choose a faucet or tile. If you cannot decide, tell us early so we can plan around it.

What can slow things down

  • Hidden problems found after demolition.
  • Back-ordered cabinets, appliances or tile.
  • Inspection scheduling.
  • Changes to the scope after work begins.
  • Countertops that cannot be templated until cabinets are in.

Get a schedule for your kitchen

Call (336) 654-1130 and we will walk through the room and give you a realistic outline of the phases for your project. For the full range of work, see kitchen remodeling.

How to keep the schedule realistic

The best schedules are honest about the slow parts. Cabinet lead times, countertop fabrication and inspections are the pieces we cannot rush. Everything else can be arranged around them. Ask for a written outline that shows the phases, the expected order and which decisions are needed from you and by when.

A schedule is also a communication tool. We recommend a short check-in at the start and end of each week during active work, so that you know what is happening and what is next.

Decisions to make early

  • Cabinet style, finish and hardware.
  • Countertop material and edge profile.
  • Sink and faucet type, since they affect cabinet and counter cutouts.
  • Appliance models and sizes.
  • Backsplash tile and layout.
  • Lighting plan, including under-cabinet lighting.
  • Flooring, and whether it runs under the cabinets.

Small kitchens and updates

Not every kitchen needs a full remodel. If the layout works, you can refresh cabinets, counters, backsplash and lighting in a shorter project. The phases are the same, but demolition and rough-in are lighter. This kind of update can transform a kitchen without major construction, and it is often the best value. See kitchen cabinet installation for options.

If you are thinking about opening a wall to the living area, that changes the project. It may involve a beam, new electrical and heating changes, and a permit. Read about open floor plan remodeling.

Weather, holidays and your calendar

Seasonal factors matter. Holidays can slow deliveries and inspections. If you want the kitchen ready for a specific event, work backward from that date and build in time for delays. Do not schedule the final days too tightly, since last details such as trim and appliance hookups can take longer than expected.

Also consider your own calendar. Travel, work deadlines and guests all affect how you experience the project. Tell us about them at the start.

Final walk-through and punch list

At the end of the project, we walk through the kitchen with you and make a list of small items to fix or adjust. Cabinet doors may need alignment, paint may need a touch-up and hardware may need tightening. This is normal, and finishing the list is part of a good job. Test every appliance, faucet and light, and ask any questions about care and cleaning. Keep manuals and warranty information together.

Keep a running list during the project

Keep a notes file on your phone for questions, small defects and decisions pending. Share it at the weekly check-in. It keeps small issues from being forgotten and gives the final punch list a head start. Photos taken as the work progresses are also useful for your records, especially before walls are closed.

Questions we hear on the phone

Short answers to what callers ask most. Call if yours is not here.

What is the longest part of a kitchen remodel?

Often the lead time for cabinets and countertops.

Can I stay in my house during a remodel?

Most people do, with a temporary kitchen setup.

When are permits applied for?

During planning, before work begins.

Why wait to measure countertops?